← Founder Notes
Archive

Meta just stopped renting nvidia for training. its third-gen mtia accelerator, codenamed iris and…

Yethikrishna ROriginal on Threads

meta just stopped renting nvidia for training. its third-gen mtia accelerator, codenamed iris and now in production this september, is a broadcom-designed 3nm chip aimed at doubling meta's compute footprint to 14 gigawatts.

the nvidia monopoly inside meta is over.

Context

Reuters, republished by CNBC on 9 July 2026 from an internal memo it reviewed, reports that Meta planned to start manufacturing its Iris AI chip from September as part of a plan to raise computing power to 14 gigawatts next year, with Broadcom on design and TSMC on manufacturing. The chip is described as aimed at augmenting the GPUs Meta buys from Nvidia and AMD. Meta's own post of 11 March 2026 lists four MTIA generations in two years, with MTIA 300 on ranking and recommendation training and already in production, and MTIA 400, 450 and 500 mainly for generative AI inference. Meta Engineering's post of 24 August 2026 describes MTIA 300 as the first of a family of training accelerators for ranking and recommendation models.

How it compares

Production in September is a plan reported from a memo as of 9 July, and no first-party or later confirmation was found. No source read maps Iris to a third generation, since Meta's pages use MTIA 300, 400, 450 and 500, and 3nm was not in the text read. Stopped renting Nvidia for training does not match the sources, which describe the chip as adding to purchased Nvidia and AMD GPUs and put MTIA 300 on ranking and recommendation training. The 14 gigawatts is the memo's company-wide plan (7 in 2026, 14 the next year), not an effect of one chip. The monopoly inside Meta is over is the author's take.

Watch next

  • A Meta or Broadcom confirmation of the production start and how Iris maps to the MTIA numbering.

Sources

  1. Meta to put AI chip into production in September (CNBC, 9 Jul 2026)cnbc.com
  2. Expanding Meta's custom silicon to power our AI workloads (Meta, 11 Mar 2026)about.fb.com
  3. MTIA 300: Meta training chip with built-in NICs (Meta Engineering, 24 Aug 2026)engineering.fb.com

Provenance

The note above is reproduced unedited from the original post, first published on Threads on 21 September 2026 at 13:04 IST. Sources are the papers and datasets the note draws on.

View the original post
Embed this note
<iframe src="https://founder.myndlabs.tech/notes/embed/meta-just-stopped-renting-nvidia-for-training-its-DdiomjwjT8W" width="480" height="420" style="border:0;max-width:100%" loading="lazy" title="Meta just stopped renting nvidia for training. its third-gen mtia accelerator, codenamed iris and…"></iframe>

More notes